![](/uploads/images/407.jpg)
Bio-Medical / Pharmaceuticals
White City Campus
Client:Imperial College London
Main Contractor:M J Lonsdale
Total Project Value:£3.5m
Peak Manpower:60
Project completion:July 2018
Imperial College London have been growing the White City Campus to provide a world class platform for innovation, entrepreneurship and multidisciplinary research.
LMOB were employed for the Block C - Fit Out for the full supply, set to work, Install, Test, Commissioning, Witness, Demonstrate and train the complete Electrical solutions which included:
- Installation of all Containment management systems both High and Low level throughout for all disciplines inclusive of full bracketry design
- Installation of all Underfloor power track inclusive of electrical desk modules and floor grommets
- Installation of all Lighting, Lighting Control, Emergency Lighting and Specialist task lighting to labs
- Installation of all Small Power Systems
- Installation of full Earthing and Bonding System
![](/uploads/images/w800/220.jpg)
Accreditations
![Partner](/uploads/images/436.png)
![Partner](/uploads/images/353.jpg)
![Partner](/uploads/images/352.jpg)
![Partner](/uploads/images/351.jpg)
![Partner](/uploads/images/97.jpg)
![Partner](/uploads/images/98.jpg)
![Partner](/uploads/images/100.jpg)
![Partner](/uploads/images/103.jpg)
![Partner](/uploads/images/104.jpg)
![Partner](/uploads/images/105.jpg)
Warning: Invalid argument supplied for foreach() in /home/cogne/public_html/ignite/core/frontend/partner_logos.php on line 14